Tent installation guide
Issues time:2013-3-23
Installation: (before installation customer need to prepare tools: ladder two, adjustable wrench two, hemp two <30 meters, 50 meters, the tape.)
The first step: the positioning column plate
First determine the installation site of the ground level, then the positioning soleplate, from the bottom center to the bottom center longitudinal distance of 15 meters, 5 meters of horizontal, because of this tutorial is to span 15 meters of the tent as an example, so the vertical distance of 15 meters, is the length of the transverse direction tent, in multiples of 5 meters unlimited extension. Attention must be the center to center distance. Determination of four plate position and then measuring the diagonal distance is equal to. Not equal to to adjust the position, make sure the rectangle instead of a parallelogram. A good place to the column base plate fixed on the four position corresponding to the (fixed measure tent fixed way see the third day:). The same method will be other floor length of the mind and fixed.
The second step: put a good part
The column, beam angle node, A segment, B segment (beam injection over a span of 14 meters need to use two section beam, beam) receiving component (the component without connecting beam section and the inclined beam with A B, span 14 meters below the top node), according to the set, all the components of a gable, also known as the dough span frame. The gable surface parts other according to the same principle in place, attention must be heading for a flat on the ground.
The third step: to connect string A/B
The A segment is inserted into the sloping beam segment of the B beam bearing piece (will undertake to beam assembly beam B while our packaging), tied into the two screws (Note: the hole not install screws), and tighten the nut. The same method of installing other string A, B (if in the span of 14 meters below the skip this process.)
The fourth step: install the top node
Those AB segment will be connected well connected with the top node, tied into the screw, and tighten. If the first words must install cable wire flowers, flowers will wire cable without flowers cable end of the buckle seat is arranged on the beam segment of the B second holes, as shown below: tied into the screw, a nut, make sure the buckle seat can rotate freely (if it is without installation of steel wire flower cable gable this hole is not loaded, screw).
Note: to penetrate in the screw screw screw must be paid attention to are generally toward the tent inside, and the first fan gable and second fan gable screws are relative to wear, especially the installation direction of the steel wire cable must be relative to the flower, only when such gable erected wire flower cable was able to pull. Install all the top node and the beam in AB with this method.
The fifth step: install the corner joint
The inclined angle insertion node beam A segment, and the upper end of the upright post is connected to the angle of the end nodes, at the same time to penetrate in the screw and screw on nuts.
Note: if the installation of steel wire flower cable and a cross rod, angle of oblique end nodes above the hole mounting screws, corner joint end below the hole mounting screws. The same method of installing other corner joint.
The sixth step: to connect the column and the bottom plate
The plug-in hole column on the alignment plate hole connecting screws, and tighten the nut. The same method connect the other column base plate and column. Note the installation process must be handled carefully, there is certain to use the wooden side the gable pad assembled, when mobile aluminum must lift the whole frame, avoid aluminum on the ground with sand and other goods caused by the friction of aluminum surface scratch. In addition to after the first installation of column and the bottom board mounting column with corner node, the effect is the same. Assembling all gable, placed beside the bottom ladder first fan gable sides (ladder) to erect gable after installing the cross rod, ready for the screw and the wrench and personnel, ready next and cross bar up to column. Installation of 15 meters span tent best has more than 12 personnel with the installation, ready for all the work into a vertical gable step.
The seventh step: vertical gable
All the staff are divided into four teams, two people pull rope, angular node station 2 people, other people are standing on the peak, the gable to lift, lift to a certain height, the middle people ran to help both sides will continue to raise the gable. Wire rope pulling people to shun the force will gable pull.
When the gable vertical to 70 degrees when to pause, and then slowly stands perpendicular to the ground, pulling wire rope of the people at this time, standing a little force will be on top. At the same time, a few people to help. Two people will cross rod flat iron end is mounted to the upper end of the upright post below the screw top, and tighten the nut. The other end of the cross rod is connected to the bottom of the second adjacent fan gable on below the hole, screw and tighten the nut. Note that the base plate is fixed in advance good, otherwise when pulled the gable plate moves. Use the same method to erect second fan gable, and installed the other two cross rod. As shown below: install the cross rod two fan gable can be completely let go, a cross rod, a tent frame formed a triangle. So it is very stable. The following work is to install the beams and purlins.
The eighth step: install beams and purlins
Section beam is house shape, section shape purlin is square. Installation is as follows, the hooked end toward the beam or bar, then a certain tilt angle will bend hook hanging PI iron U shaped ear angle on the node or the oblique beam. Use the ladder will be straight hook beam / purlin slowly and then put into the hook relative side of the gable beam or angle node hanging ears. The beam is generally between two gable of the three, both ends of each one, the top one, purlin according to span size increase or decrease. All the beams and purlins hang the first gear in the span of 15 meters, for example, need to hang three beams, four supported purlin. Then put the wire cable to pull flower staggered to the first hole angle node position, and tighten, must spend at the upper end of the wire rope cable fixed time to tighten the wire rope, prevent rotating flower cable wire rope to rotate along with the. Use the same method to erect other gable and installed. The middle mountain wall due to not install cable wire flowers, so must use the rope to tie the top node draw and stabilize the gable role. At the end of each vertical good side Gables beams and purlins must be installed immediately.
The ninth step: installation support
The support is connected to the small beam segment of the A, and insert the screws, tighten the nut. Install support, the side beam hanging angle node and the support lugs on. Note that when hanging lateral beam must be installed from the side of the beam end fittings, the side of the beam end hanging lugs accessories in the corner nodes, then slowly straight hook, the ear hanging mounted to support the above, do not install the straight hook, or not installed successfully. With the installation of beams and purlins, must first from the hooked end of installation, then hanging straight hook.
The tenth step: install the cloth top
Two ends of the cloth top drawstring place into the rope, strap toward the tent. On both sides of the rubber strips into the beam and then the cloth top head slot, the other end of the rope from the whole frame of tent is thrown on the opposite, then four at the same time to pull rope, so that the cloth top along the oblique beam tank slowly pull to the side. Remember to also pull, or cloth top will be stuck to not move, solve this problem only the cloth top back pull a certain position and then again at the same time, pull, must also move cloth top. The same method pull the other cloth top.
The eleventh step: install side triangle
With the installation of cloth top is almost need rope pull, but when installing side triangle someone must stand to (with a high ladder) next to the top node of the rope, the only difference is, with side of the triangle is outside. The first side of the triangle into oblique beam groove, then stood in the middle of the people to pull rope, and stood in the corner nodes to lift the good side of the triangle to strip along the groove go. Install side of the triangle to the attention of the left and right division, do not install anti. Then pull the two side of the triangle will raphe tube from the bottom between the two side of the triangle is a cut strips slowly place to wear (raphe tube with a flat iron a looked inside.). When wearing the top node of the flat iron hang into the ear hanging top nodes, while lower end cut strips of a rubber strip to penetrate raphe tube end.
The twelfth step: the installation of curtain
The curtain opened, positive (above a rope or a cover face outwards), first glue into the column top slot milling. Then slowly pulled up to the top of the time, the gap will hang the code into the beam milling groove, attention should turn a good stuffing, plug, lower the curtain around the rubber strip from the milling groove downwards into the column, the curtain is pulled toward the center, and there will be a surface on the side of the rope behind the tent rings, the rope sequentially from top to bottom are connected in series.
The thirteenth step: install the cloth top pressure rod
The cloth top pressure rod into the cloth top pressure rod sleeve (i.e. cloth top two there is a double-layer sleeve, then the end pressure iron on the bar, and seamless rectangular screw penetrates into the corner nodes within the.
Note: two pieces of cloth top middle with direct pressure rail connection. This step can also be installed in the front curtain.
The last step is to put the curtain rod (1 inch galvanized pipe) into the curtain around the bottom of the pressure rod sleeve to prevent the wind curtain blowing.
To this, the whole installation process completed successfully.
Number of visits:817
 

    copyright © Shenzhen Xingda canvas Co. the company  
Free Tel: 4008313169 Fax: 0755-61139855
E-mail: xdfanbu@163.com QQ:1198072534
E-mail: xdfanbu@163.com contact: Mr.
Address: Shenzhen City, Guangdong Province, Baoan District Phoenix Hill Industrial District postal
code: 518000
 
 

Powered By: szxunjian   buxun

Links:   Prosperous canvas factory   Shenzhen News Network   Tencent.com   Bing search   Yahoo   SOSO   Google   Baidu   Design company in Shenzhen   Zengcheng plant rental   Longhua website construction   Zhejiang Pujiang crystal handicraft   Shenzhen Crystal Crafts Factory  

Keywords | main products:Canvas - in canvas factory - in - in tarp tarpaulin factory - in tarpaulin factory - in waterproof cloth - in waterproof cloth in - in - waterproof canvas paulin in canvas factory in Shenzhen - Shenzhen - Shenzhen - rain factory in tarpaulin factory in Shenzhen paulin - in Shenzhen - Dongguan - waterproof canvas canvas factory in Dongguan rainproof cloth factory - in Dongguan - Dongguan waterproof canvas tarpaulin factory